Current Projects

  • T-1206

    T-1206 This project focuses on the Seamist Drive corridor and consists of the complete reconstruction of Seamist Drive between 11th Street and Kury Lane. A new storm water drainage system with in-line detention [...]

  • T-1203

    T-1203 Sidewalk conditions in the TIRZ 12 boundary and immediate surrounding area vary widely, with some corridors having decent pedestrian infrastructure, while others have aging or inaccessible sidewalks. Several streets lack any type [...]

  • T-1202

    T-1202 This project includes multi-street improvements throughout the zone which provide an immediate community impact on the area mobility, such as roadway resurfacing, sidewalk replacement, curb and ramp repairs, pavement markings, signalization, trail connections [...]

  • T-1201

    T-1201 Several roads in the TIRZ 12 area are drained by roadside ditches. While some ditches are being well-maintained, others are overgrown with vegetation, accumulated sediment, and do not drain properly. This project [...]